ImexInvest

International logistics

Oversize and heavy machinery transport

We carry what a regular carrier will not take: excavators, cranes, industrial lines, oversize structures. By sea, air, road and rail — from anywhere in the world to your site.

10+

years on the market

60 т

maximum weight

21 м

platform length

5%

commission

Which transport to choose

A comparison by transit time, weight and price — so you know what you pay for

TransportTransitWeightCostWhen to choose
Road3–10 daysup to 60 tmediumEurope, oversize, door-to-door delivery
Sea20–45 daysunlimitedlowestAsia and the USA, large batches, when timing is flexible
Rail8–25 daysup to 70 tlower than roadChina and Europe, heavy cargo, a compromise of price and speed
Air1–7 daysup to 5 thighestUrgent spare parts, production downtime, valuable cargo

Dimensions and permits

Cargo becomes oversize as soon as any single limit is exceeded — then permits are required

Width

No permit up to

2,55 м

Above this a permit is required, over 3.5 m — escort

Height

No permit up to

4,00 м

Above this bridges and power lines must be checked

Length

No permit up to

22,00 м

Above this a dedicated route and turn approvals are needed

Gross weight

No permit up to

40 т

Above this axle load calculation and a permit are required

Not sure about your dimensions? Send the machine model and photos — we will find the specifications ourselves.

Trailers and platforms

We match the trailer to the exact weight and dimensions of your machine

TypeCapacityPlatform (L × W × H)Typical cargo
Lowbed trailerдо 60 т13,6 × 3,0 × 0,45 мExcavators, bulldozers, mobile cranes
Extendable platformдо 40 т13,6–21,0 × 2,55 мSteel structures, turbine blades, trusses, pipes
Modular trailer60 т і більшевід 15,0 × 3,5 мTransformers, reactors, presses
Curtain-side trailerдо 22 т13,6 × 2,45 × 2,7 мPallets, groupage, spare parts
Container chassisдо 30 т20 / 40 футівContainers, flat rack for oversize

How an oversize shipment runs

Six steps from measurements to unloading at your site

  1. 01

    Measurements and photos

    You send dimensions, weight and photos. If you lack data, we explain what and how to measure.

  2. 02

    Choosing the transport

    We calculate which trailer fits by weight and dimensions and whether an extendable platform is needed.

  3. 03

    Route and permits

    We plan the route accounting for bridges, tunnels and power lines, and obtain oversize permits.

  4. 04

    Loading and securing

    Crane or self-propelled loading, a securing plan for the specific machine, photo report before departure.

  5. 05

    Escort on the road

    Escort vehicles and, when required, police. Cargo status is visible in your account and Telegram.

  6. 06

    Unloading and payment

    We unload at your site. You settle up after the machine is already yours.

What affects the cost

Understanding these factors helps you save already at the planning stage

Dimensions and weight

The main factor: the further beyond the norm, the pricier the trailer and permits

Route and countries

Number of borders, toll roads, detours due to bridge limits

Permits and escort

Beyond-norm dimensions require permits in every country and escort vehicles

Urgency

A next-day departure costs more than a planned loading in a week

Insurance

Basic liability is included, extended insurance is optional

Loading and unloading

Whether a crane is available on site or the machine drives on by itself

Documents we prepare

All we need from you is an invoice and company details — the rest is on our team

  • CMR — international consignment note
  • Customs declaration and T1 for transit
  • Oversize transport permit
  • Cargo securing plan
  • Cargo insurance policy
  • Invoice and packing list

Calculate your delivery

Choose the route and delivery type — the calculator will open pre-filled

Frequent questions about oversize

From what weight is cargo considered oversize?

It is not only weight: cargo becomes oversize when any limit is exceeded — width 2.55 m, height 4 m, length 22 m or gross weight 40 tonnes. One parameter is enough.

How long does a permit take?

Usually 2–5 working days per country. For complex routes with bridge approvals — up to 10 days. We start as soon as dimensions are confirmed.

What if I do not know the exact dimensions?

Send the machine model and photos — we will find the specifications ourselves. For non-standard structures we explain which measurements are needed.

Who is liable if the machine is damaged in transit?

We are. Carrier liability applies at every stage; we record the condition with photos before loading and after unloading. Extended insurance is available on request.

Can machinery be shipped disassembled?

Yes, and it is often cheaper: a removed boom or cab can take the cargo out of the oversize category and remove the need for permits. We will price both options.